DSC_0108.jpg
       
     
Public Assembly Show modification
       
     
  The renovation of    Studio 54    was phased to minimized theatre down time and reduce the impact on the established performance schedule. We designed a complete renovation of the balcony restrooms, created a cellar lounge space from a rabbit
       
     
Signage Replacement
       
     
53rd sign.jpg
       
     
IMG_4342.jpg
       
     
HVAC Phase II
       
     
Plaster Repair
       
     
plaster.jpg
       
     
IMG_4151 (2).jpg
       
     
DSC_0108.jpg
       
     
Public Assembly Show modification
       
     
Public Assembly Show modification
  The renovation of    Studio 54    was phased to minimized theatre down time and reduce the impact on the established performance schedule. We designed a complete renovation of the balcony restrooms, created a cellar lounge space from a rabbit
       
     

The renovation of Studio 54 was phased to minimized theatre down time and reduce the impact on the established performance schedule. We designed a complete renovation of the balcony restrooms, created a cellar lounge space from a rabbit warren of offices, coordinated the complete restoration of the brick facades, designed new exterior signage and marquee, and tackled roof repairs, plaster repairs and ADA compliance issues.

Signage Replacement
       
     
Signage Replacement
53rd sign.jpg
       
     
IMG_4342.jpg
       
     
HVAC Phase II
       
     
HVAC Phase II
Plaster Repair
       
     
Plaster Repair
plaster.jpg
       
     
IMG_4151 (2).jpg